![](/images/stories/CoastalDefencesPhase2/Pictures/2014%20001.jpg)
Different shaped Groyne 2 the most northerly structure and the first to be started
![](/images/stories/CoastalDefencesPhase2/Pictures/2014%20002.jpg)
Graham Randell (Foreman) responsibile for keeping the work progressing throughout high & low tides
![](/images/stories/CoastalDefencesPhase2/Pictures/2014%20004.jpg)
Water is pumped out of the base of groyne 2 to allow the rocks to be placed in the correct GPS position
![](/images/stories/CoastalDefencesPhase2/Pictures/2014%20005.jpg)
Stockpiled rock for the next structure to be constructed
![](/images/stories/CoastalDefencesPhase2/Pictures/2014%20006.jpg)
Rock brought in by lorries is stored here, by weight and size for distribution to groynes and breakwaters
![](/images/stories/CoastalDefencesPhase2/Pictures/2014%20007.jpg)
The road to access to the structures with very little traffic on the beach sand to preserve the ancient sunken forest.
![](/images/stories/CoastalDefencesPhase2/Pictures/2014%20008.jpg)
Excavators are wirelessly connected to GPS equipment for accurate positioning of rock on structures
![](/images/stories/CoastalDefencesPhase2/Pictures/2014%20009.jpg)
Stockpiled 4-6 ton rocks
![](/images/stories/CoastalDefencesPhase2/Pictures/2014%20010.jpg)
All the rocks are placed in position so there is lttle risk of accidents due to falling rocks.
- Hits: 7481